Email Plan of Correction from Inspection to: Subject Line: POC (Application Number) for (Inspector’s Name).Contact InformationĮmail Inquiries: Email Application to: Email Inspection Request to: Subject Line: Inspection Request App# (enter Application Number) Construction does not include excavation or site preparation. Staff occupancy may be granted under certain circumstances. The Final Architectural Inspection Form is required before patients can occupy the facility. As needed, they may conduct a final inspection for each phase. The ARU will inspect the facility during construction. The ARU’s application and inspection process is necessary to receive license approval from HHSC.Īfter the application has been approved, construction can begin. Where a currently licensed facility is affected by a disaster and will be undergoing repairs.Renovation consisting of construction, additions, alterations, renovations, remodeling, equipment and finish upgrades, repairs, building system upgrades, removal of a function, demolition, change of service(s) or retrofitting a function such as but not limited to changing of licensed bed designations or ESRD treatment and training designations, or a change of invasive procedural services. Construction of a facility for an initial license, including relocation, re-opening a closed facility or a conversion of a licensed or previously licensed healthcare facility to a different licensed designation.Private Psychiatric Hospitals and Crisis Stabilization UnitsĪpproval of an application package in writing by the ARU is required before any of the following steps are taken or construction begins:.Freestanding Emergency Medical Care Facilities.Medicaid Supplemental Payment & Directed Payment ProgramsĪn application package is required for any person, facility or corporation modifying or building a physical plant for the following types of healthcare facilities, which are regulated by the HHSC Architectural Review Unit:.
0 Comments
Leave a Reply. |